Projects

Portfolio of water supply assignments

Four representative studies. Specs below describe capacity, location and engineering scope typically delivered under a professional appointment.

50 MLD Municipal Water Distribution Network

City-wide hydraulic model, DMA delineation, 186 km of DI/HDPE mains, 4 ESRs and operational zoning for 24×7 conversion.

Engineering outcomes

  • Residual pressure 12–18 m in all DMAs under peak hour
  • EPANET/WaterGEMS calibrated model handed to the utility
  • NRW baseline established for subsequent leak-detection phases

Industrial Raw Water Intake System

River intake, stilling basin, raw water pumping station and 14 km MS transmission main serving a petrochemical cluster.

Engineering outcomes

  • Dual-train pumping with N+1 reliability
  • Surge vessels and control philosophy for transient events
  • GIS-aligned alignment avoiding existing ROW conflicts

24 MLD WTP with Clear Water Reservoirs

Conventional treatment train, 8 ML CWR, high-lift pumping and interconnects to existing city reservoirs.

Engineering outcomes

  • Process hydraulics confirmed across monsoon turbidity peaks
  • Chemical house and sludge drying beds integrated on constrained site
  • Detailed engineering drawings issued for EPC tender

NRW Reduction Programme

Water balance, night-flow logging, pressure management and leak localisation across three district metered areas.

Engineering outcomes

  • Apparent and real losses separated in IWA water-balance format
  • Priority mains identified for replacement vs. repair
  • Utility staff trained on logger interpretation and DMA operation

Request for quotation

Brief a principal engineer on your water supply assignment

Provide organization details, package type and an indicative capacity. We respond with a scoped fee proposal or a clarification call — not an automated quote.